Wednesday, March 27, 2024

Super CPH Railcar. 28-03-2024.

Good morning,

Is it possible to build a New Railcar,

Or even 6 of them,


A 19 seat version,

And, a 25 seat version.

Any thoughts Please.

2 K 19 Diesels Motors on each Railcar.

Space for two palletts in the middle of the Railcar

Update,

The luggage area/Parcels and Palletts could have an extra 6 fold down seats,

Increasing capacity to 25 and 31.

The most important part is, they will be driveable from both ends.

These railcars could be run together or singlely, depending on demand.

They could be made for use in NSW and SA.

In my opinion these would be Ideal for increasing Rural Passenger Rail services.

6.17 am

Saturday the 30-03-2024.

Mr David Peters-Secret Admin.

From Croydon West, or is it West Croydon,

Adelaide,

South Australia.

You like to Big Note Yourself, and, put me down for my Ideas, because you think I am an Idiot.

I am an endentured Tradesman,

With a Certificate to prove it.

Worked in the Manufacturing Industry for 30 Years plus,

So I think I may have learned a bit in that time.

At least I am trying to make change.

TWO MOTORS,

THE PURPOSE OF TWO MOTORS IS, IF ONE BREAKS DOWN, IT STILL HAS PROPULTION WITH THE ONE MOTOR, A SAFETY ISSUE.

HAVE A SIMPLY WONDERFUL DAY.

1-49 pm,

31-03-2024,

Afternoon,

Something Interesting has been posted,

In the Post above I am named as a "Private Investor"
"the Creator"
The Idea, of Building a New Train has been put forward by myself and others with the hope that there will be an interest in running smaller Railcars, to service areas where there are no Rail Passenger Services ATM.
This is not about me being an Investor, not about being a Creator, Not about being a Railway Developer.
It is about putting an Idea/Ideas forward, to improve Rail Passenger services in New South Wales.

The Idea/Plan is to Build between 1 and 6 Railcars, with possibly more later if they are successful, Yes there are Processes that have to be gone through, working with the Regulator, the Builder, the Designer, and the workforce of the Builder. Yes Engineering Drawings would be used, which are Proffessional Drawings, which would be part of the Presentation to the Regulator.

From 1967 till 1999, I was fortunate to work with Engineering Drawings, so I know a Bit about them.

The Money,
It is up to the people who would be interested in seeing this Project through, who would be likely to invest in the Project, It could be a Private/ Government type Project.